General enquiries:

Fencing enquiries:

Erecting and Earthing your Fencer

  • Connect PI36 2.5mm cable from fencer terminal to fence wire
  • Connect PI36 2.5mm cable from earth terminal to first earth bar
  • Earth field must be moist and located 33ft from
  • Any electrical or telephone earth stake.
  • Any water pipes including disused water pipes
  • Any buildings using structural steel or reinforcing steel in ground.
  • N.B.Use 5ft long earth bars at least 12-15ft apart.

 

Search Product Below: